Topics
Close Topics
All E-Posters
Biological Mechanism of Interventions (e.g. Pain Relief, Motor Learning)
Cell and Tissue Adaptation and Maladaptation (e.g. Plasticity, Molecular Mechanisms and Mediators)
Classification of Functioning (e.g. ICF Core Sets; ICF Up-Date and Revision)
Comprehensive Rehabilitation Intervention Research - Miscellaneous
Comprehensive Rehabilitation Intervention Research - Rehabilitation Service Evaluation (including Acute, Post-Acute and Community Rehabilitation Services)
Comprehensive Rehabilitation Intervention Research - Rehabilitation Strategies for Specific Issues (including Rehabilitation Strategies for Developing Countries and Rehabilitation after Natural Disasters)
Comprehensive Rehabilitation Intervention Research - Rehabilitation Technology Assessment (e.g. Tele-Rehabilitation)
Education and Training in Rehabilitation - Training in Science and Research
Education and Training in Rehabilitation - Training of Other Rehabilitation Professionals
Education and Training in Rehabilitation - Undergraduate Medical Education
Functioning Epidemiology (Population-Based Comparative Studies of Functioning Across Conditions, Cultures, and Time, e.g. on Employment of People with Disability)
Functioning Impact Assessment (e.g. Prediction of the Implications of Policy and Legislation on Functioning)
Geriatrics - Other Geriatric Conditions
Geriatrics - Risk of Falls in the Elderly
Geriatrics - Sarcopenia
Integrative Rehabilitation Sciences: Education and Training in Rehabilitation - Specialist Training
Internal Medicine and Other Conditions - Bladder and Bowel Disorders
Internal Medicine and Other Conditions - Burns
Internal Medicine and Other Conditions - Cancer
Internal Medicine and Other Conditions - Heart, Cardiovascular and Lymph Diseases
Internal Medicine and Other Conditions - Metabolic Disorders (e.g. Obesity, Diabetes Mellitus)
Internal Medicine and Other Conditions - Miscellaneous
Internal Medicine and Other Conditions - Organ Transplantation
Internal Medicine and Other Conditions - Pulmonary Diseases
Measurement of Functioning (e.g. Psychometrics of Assessment Tools; Operationalisation of ICF Categories)
Mechanisms of Tissue Injury (e.g. Inflammation, Repetitive Strain) and Development of Organ Dysfunction (e.g. Atrophy, Spasticity, Chronic Pain)
Miscellaneous
Musculoskeletal Conditions - Back Pain and Spine Disorders
Musculoskeletal Conditions - Bone Diseases (e.g. Osteoporosis)
Musculoskeletal Conditions - Degenerative Joint Diseases (e.g. Osteoarthritis)
Musculoskeletal Conditions - Inflammatory Joint Diseases (e.g. Rheumatoid Arthritis, Ankylosing Spondylitis)
Musculoskeletal Conditions - Miscellaneous
Musculoskeletal Conditions - Musculoskeletal Trauma (e.g. Fractures) and Sports Injury
Musculoskeletal Conditions - Regional Pain Syndromes of the Neck and Upper Extremity (including Enthesopathy, Tendinitis and Others)
Musculoskeletal Conditions - Regional Pain Syndromes of the Pelvis and Lower Extremity (including Enthesopathy, Tendinitis and Others)
Neurological and Mental Health Conditions - Autoimmune and Inflammatory Neurological Conditions (e.g. Multiple Sclerosis)
Neurological and Mental Health Conditions - Language and Speech Disorders
Neurological and Mental Health Conditions - Mental Disorders (e.g. Depression; Bipolar Disorders)
Neurological and Mental Health Conditions - Miscellaneous
Neurological and Mental Health Conditions - Nerve Injury
Neurological and Mental Health Conditions - Neurodegenerative Diseases (e.g. Dementia)
Neurological and Mental Health Conditions - Spinal Cord Injury
Neurological and Mental Health Conditions - Stroke
Neurological and Mental Health Conditions - Traumatic Brain Injury
Neurological and Mental Health Conditions - Vegetative States, Minimally Conscious and Low Awareness States
Paediatrics - Cerebral Palsy and Spina Bifida
Paediatrics - Developmental Disorders
Paediatrics - Miscellaneous
Pain - Acute Pain
Pain - Chronic Generalised Pain Syndromes (including Fibromyalgia)
Pain - Complex Regional Pain Syndromes
Pain - Miscellaneous
Physical and Rehabilitation Medicine Diagnostics as Related to Organ Systems and Body Functions - Diagnosis and Assessment of Functions of the Cardiovascular, Haematological, Immunological, and Respiratory Systems
Physical and Rehabilitation Medicine Diagnostics as Related to Organ Systems and Body Functions - Diagnosis and Assessment of Functions of the Digestive, Metabolic, and Endocrine Systems
Physical and Rehabilitation Medicine Diagnostics as Related to Organ Systems and Body Functions - Diagnosis and Assessment of Functions of the Skin and Related Structures
Physical and Rehabilitation Medicine Diagnostics as Related to Organ Systems and Body Functions - Diagnosis and Assessment of Mental Functions (including Neuropsychological Assessment)
Physical and Rehabilitation Medicine Diagnostics as Related to Organ Systems and Body Functions - Diagnosis and Assessment of Neurological, Musculoskeletal and Movement Related Functions (including Gait Analysis, Posturography)
PRM Interventions Research - Electrotherapy (including Functional Electrophysiological Stimulation)
PRM Interventions Research - Exercise
PRM Interventions Research - Heat and Cold
PRM Interventions Research - Prosthetics and Orthotics
PRM Interventions Research - Rehabilitation Technology, including Implants, Prosthesis, Orthoses
PRM Interventions Research - Robots, Aids and Devices
PRM Interventions Research - Virtual Reality
Rehabilitation Addressing to Specifc Issues - Management of Fatigue and Sleep Disorders
Rehabilitation Addressing to Specifc Issues - Other Specific Functions
Rehabilitation Addressing to Specifc Issues - Rehabilitation after Limb Amputation
Rehabilitation Addressing to Specifc Issues - Sensory and Motor Control (including Postural Control)
Rehabilitation Addressing to Specifc Issues - Sexual Functioning in People with Disability and Chronic Health Conditions
Rehabilitation Addressing to Specifc Issues - Spasticity Management
Rehabilitation Addressing to Specifc Issues - Wound and Pressure Sores Management
Rehabilitation Management and Administration - Miscellaneous
Rehabilitation Management and Administration - Rehabilitation Service Management (including Integrated Care and Service Concepts)
Rehabilitation Systems and Services Research - Community-Based Participation Research
Rehabilitation Systems and Services Research - Miscellaneous
Rehabilitation Systems and Services Research - Rehabilitation Service organization
Social Integration Programmes and Rehabilitation for Specific - Community Based Rehabilitation
Social Integration Programmes and Rehabilitation for Specific - Support, Assistance and Independent Living
Social Integration Programmes and Rehabilitation for Specific - Vocational Rehabilitation
Sports in Rehabilitation and Sports Rehabilitation
Theory and Models of Functioning (e.g. Disability Creation Process)
All E-Posters
Previous
Next
Chun-De LIAO
Effectiveness of Stellate Ganglion Blockade Using Light Irradiation in patients with Complex Regional Pain Syndrome
Il Young Jung
Comparison of body composition and metabolic profile in chronic spinal cord injury patients depending on the severity of spasticity
Ta-sen Wei
Tilt Table Test with an Integrated Biosensor System to Identify Risk Factors of Dizziness in Hospitalized Stroke Patients
Download
Jheng Dao Yang
Intermittent Cervical Traction for Treatment of Neck Pain: A Meta-analysis of Randomized Controlled Trials
Jing Zhou
Whether carrying ApoEε4 or not seems to be not an influence factor on the rehabilitation outcome for people with spinal cord injury
Download
Haoyu Huang
A CASE REPORT OF SOTOS SYDROME WITH 5Q35.2-Q35.3 DELETION AND REVIEW OF THE LITERATURE
Download
Hong Fan
Robot-based rehabilitation of the upper limbs in acute stroke
Download
Xinxin Lu
The mechanism of vagus nerve stimulation(VNS) in the treatment of a model rat with acute focal cerebral ischemia
Download
Hsin-Han Cheng
THE TREND OF GROWTH AND SEVERITY OF DEVELOPMENTAL DELAY OVER DIFFERENT AGES IN TERM AND PRE-TERM CHILDREN
Download
Dr. Abena Yeboaa Tannor
ONLINE/IN-PERSON 1 YEAR FELLOWSHIP IN PRM: A SUSTAINABLE BEGINNING FOR REHABILITATION MEDICINE IN SUB-SAHARAN AFRICA
Download
Norazlina Abdul Aziz
Identifying barriers affecting participatory and social function after traumatic brain injury rehabilitation
Download
Abe Masayuki
Anaerobic threshold may be estimated by frequency analysis of heart rate variability during an incremental exercising test in patients with obesity
Allen Heinemann
Improving Peer-Reviewed Publications in Physical Medicine and Rehabilitation through Trial Registration and Reporting Guidelines
Download
Siti Jamilah Mohd Noor
An Investigation of Hearing Loss among Children Attending Intensive Rehabilitation in Malaysia
Jaeki Ahn
Ultrasound-Guided Subarcomial-Subdeltoid Bursa Injection: Comparison of Treatment Effect of Different Volume of Lidocaine and Corticosteroid
Aleksandra Tabaj
Vocational rehabilitation best practices evaluation - qualitative study
Download
Alessandro de Sire
INFLUENCE OF REHABILITATIVE APPROACH ON THE HEALTH RELATED QUALITY OF LIFE IN ADOLESCENTS WITH MILD-MODERATE IDIOPATHIC SCOLIOSIS: A PROSPECTIVE STUDY
Ali Raza
Gamekeepers thumb in a basket ball injury -Case Report
Download
João Moreira
EPICONDYLITIS. WHAT TO DO WHEN ALMOST EVERYTHING IS NOT WORKING - A CLINICAL CASE
Alma Nelly Contreras
BENEFITS OF CALISTHENICS IN PATIENTS WITH ISCHEMIC CARDIOMYOPATHY ATTENDING A CARDIAC REHABILITATION SERVICE
Download
Anne-Felicia Ambrose
IMPLEMENTING QUALITY CONTROL EDUCATION DURING REHABILITATION RESIDENCY
Download
Anne-Felicia Ambrose
Synthetic Marijuana - A New World Scourge: A Case Report of a Hemorrhagic Stroke and Review of the Neurological Complications and Differences in Management
Download
AHMEE OH
National industrial Kyoto Japanese sweets crafsman return to work from severe pain with incomplete cervical Spinal cord injury : A case report
Download
Amanda Morrow
Role of d-dimer in evaluation of deep vein thrombosis when venous Duplex study is negative: A case report
Download
Andrada Mirea
COMPARATIVE RESULTS WITH DIFFERENT PHYSICAL AND REHABILITATION MEDICINE KIND OF ENDEAVORS APPLIED IN SPASTIC CHILDREN WITH CEREBRAL PALSY
Download
Andre Thevenon
Assessment of a polydisciplinary rehabilitation program on patients with polymyosistis and dermatomyositis
Download
Anke Scheel-Sailer
Challenges and potential improvements in the admission process of patients with spinal cord injury – an interview based qualitative study of an interdisciplinary team
Download
Mohaneshwary Sandrajagran
Managing Transtibial Amputation With Rigid Removable Dressing: University Malaya Medical Hospital (UMMC) Experience And Challenges
Download
Arnengsih Nazir
The Effect of Graded Exercise on Fear-Avoidance Beliefs and Disability in Chronic Mechanic Low Back Pain Patients
Download
Seung-Chan Ahn
Swallowing Function and Nutritional Status in Community-dwelling Elders: Comparison with Community-dwelling Young Adults
Download
Kim Bong-ok
Radiographic Evaluation of Flexible Flat Foot with Rigid Foot Orthoses: 3 Years Follow up Study
Download
Joon-Ho Shin
Dual-task motor performance changes in upper extremity through robotic rehabilitation among patients with stroke.
Asma Nouira
Equina Cauda Syndrome in achondroplastic patient: Complication should not be overlooked
Asma Nouira
Children Flat Foot and Lower Limb Rotational Profile: A Cross-Sectional Descriptive Study
Asma Nouira
Depression and anxiety in mothers of children with cerebral palsy
Asma Nouira
Non-specific back pain in children and adolescents:an analytical cross-sectional study
Asma Nouira
Psychological profile of spinal cord injuries patients
Asma Nouira
Confrontation of clinical diagnosis and ultra-sonographic findings in the management of the rotator cuff disease
Asma Nouira
Urodynamic profile in diabetic bladder
Atzmon - Atzi Tsur
Inpatient Falls in a Hospital Rehabilitation Department
Download
Takeo Yonemura
FIM SCORE CHANGE AT THE TIME OF ADMISSION AND DISCHARGE IN OUR GERIATRIC HEALTHCARE FACILITY
Download
Bahar Dernek
EFFICACY OF TWO DIFFERENT PLATELET REACH PLASMA KITS WITH DIFFERENT PLATELET COUNTS IN TREATMENT OF EARLY STAGE KNEE OSTEOARTHRITIS
Miki Nishimura
The effect of combined casting, botulinum toxin injection, and physical therapy for children under the age of 1 with cerebral palsy
Download
Hsin Lun Yang
Transcutaneous Electric Nerve Stimulation Alleviates Hyperalgesia Caused by Skin Incision Surgery in rats
Download
Bérangère Gohy
FUNCTIONAL RECOVERY OF TRAUMA PATIENTS RECEIVING EARLY PHYSICAL REHABILITATION IN KUNDUZ (AFGHANISTAN) AND TABARRE (HAITI) MSF TRAUMA CENTERS
Download
Vildan Binay Safer
An Unusual Case of Os Trigonum Syndrome Secondary to a Car Accident
Download
Akira Ikumi
Use of robot suit HAL in rehabilitation of chronic spinal cord injury (tetraplegia, neurological level C4): A case report
Download
Brenda Saria Yuliawiratman
Autonomic Dysfunction in Post Stroke Patients
Buminhan Seferoglu
THE COMPARISON OF EFFECTIVENESS OF AEROBIC EXERCISE AND AEROBIC EXERCISE WITH KINESIO TAPING TREATMENTS IN FIBROMYALGIA SYNDROME
Download
Silviu Butnariu
AN ALGORITHM TO CALCULATE THE SPINE POSTURE USING A TRACKING MOBILE DEVICE
Download
Salmina Md Rifin
QUALITY OF LIFE IN LUMBAR MYELOMENINGOCELE BOY WITH UNILATERAL TRANSFEMORAL AMPUTATION : A CASE REPORT
Download
Chiho Sasaki
Remote Training Support for Communication Aid Use in Children with Spinal Muscular Atrophy Type I
Carlotte Kiekens
LAUNCH OF THE AFRICAN SPINAL CORD INJURY NETWORK (AFSCIN) : A CALL FOR PARTICIPANTS
Download
Chia-Hsin Chen
Effects of Low-magnitude Vertical Vibration on M2-related Cytokine Expression in Monocytes via Histone Modification
Francese Claire Creer
THERAPEUTIC BENEFITS OF PILATES IN PATIENTS WITH LOW BACK PAIN
Francese Claire Creer
EFFECTIVENESS OF HOLD-RELAX STRETCHING AND HOLD-RELAX AGONIST CONTRACTION STRETCHING IN INCREASING EXTENSIBILITY OF TIGHT HAMSTRING MUSCLE AMONG PUBLIC UTILITY VEHICLE DRIVERS
Ching Fen Huang
The Effect of Extracorporeal Shock Wave Therapy on Patients with Piriformis Syndrome
Chien-Hung Lai
Robotic-assisted Gait Training in Individuals with Stroke
Minkyung Cho
Abdominal Muscle Training with Pressure Sensor
Chonnikan Ariyakul
USING ROBOTIC-ASSISTED GAIT TRAINER IN NEUROREHABILITATION PATIENTS: PRELIMINARY RESULT FROM BUMRUNGRAD INTERNATIONAL HOSPITAL, THAILAND
Download
Li-Wei Chou
CARTILAGE REGENERATION IN SEVERE KNEE OSTEOARTHRITIS AFTER INTRA-ARTICULAR PLATELET-RICH PLASMA IN ASSOCIATION WITH HYALURONIC ACID INJECTION: CASE REPORTS
Wen-Kuei Chung
Personalized recreational therapy for disabled dementia patients - experiences of a community-hospital-based day care center in Taipei, Taiwan
Download
Chen Hongxia
THE EFFECT OF BO’S ABDOMINAL ACUPUNCTURE THERAPY ON SHOULDER-HAND SYNDROME AFTER STROKE
Download
Cihan Cicik
Evaluation Of Acute Effect Of Kinesiologic Taping On Pulmonary Functions In Individuals With Kyphotic Posture
Download
Masashi Katsutani
An application of new-type KAFO for patients with severe hemiplegia after stroke: Smooth replacement of KAFO with AFO
Download
Yu-Chen Lin
NEUROMARKERS FOR PREDICTING THE RECOVERY AFTER STROKE
Download
Daisuke Ito
Aerobic Exercise Improves Diabetic Nephropathy with Downregulation of Oxidative Stress in Type2 Diabetic Rats
Damayanti Tinduh
SPORT INJURY RISK FACTORS OF LOWER EXTREMITY IN ADOLESCENCE ATHELETES AT SENIOR HIGH SCHOOL OF SPORT AT SIDOARJO - EAST JAVA PROVINCE - INDONESIA
Download
Intan Sabrina
Cardiac Rehabilitation Awareness Workshop as a tool to assess the understanding of a healthy lifestyle amongst healthcare providers in a developing country
Download
Dae-Hyun Jang
Hypoxic conditioned medium from mesenchymal stem cells promotes lymphangiogenesis
Download
Rahmawaty Dian
Correlation between Homocystein Level and Functional Outcome of Patients with Ischemic Stroke at Seruni A Ward RSUD Dr Soetomo Surabaya
Download
Dilsad Sindel
ULTRASOUND MEASUREMENT OF SOFT TISSUE THICKNESS AND COMPLIANCE IN PATIENTS WITH BREAST CANCER-RELATED LYMPHEDEMA
Jingmei Dong
HABITUAL PHYSICAL ACTIVITY AND SEDENTARY BEHAVIOUR ASSOCIATED WITH BONEHEALTH IN CHINESE GRADUATE STUDENTS: A CROSS-SECTIONAL STUDY
Download
Tae Heon Lee
Effects of Boston brace on asymmetric sitting posture and back muscle activity in AIS
Shigeru Sonoda
Effect of age and cognitive function on the FIM motor subscore at discharge in stroke patients based on every motor subscore on admission
Widjajalaksmi Kusumaningsih
Phantom Phenomen Profiles in Traumatic Limb Amputee and Diabetic Limb Amputee: The Indonesian Experience
PINAR Doruk Analan
A CASE OF DROP FOOT RELATED TO IMMEDIATELY AFTER THE DIAGNOSIS OF CROHN DISEASE
Download
PINAR Doruk Analan
An Evaluation of the Effect of Vitamin D Level on Lymphedema In Patients with Malignancy
Download
PINAR Doruk Analan
The evaluation of postural balance and risk of fall in the healthy adult population consisting of a factory employees
Download
PINAR Doruk Analan
Electroneuromyographic Results of Our Sciatic Neuropathy Patients Secondary To Injection: A Retrospective Evaluation
Download
PINAR Doruk Analan
Demographic and Clinical Characteristics of our Patients with Lymphedema Secondary to Malignancy
Download
PINAR Doruk Analan
An evaluation of the effects of lidocaine injection to the trigger points on pain and disability in patients with myofascial pain syndrome
Download
Erik Setiawan
CORRELATION BETWEEN MAXIMUM VOLUNTARY ISOMETRIC CONTRACTION OF KNEE EXTENSOR USING MODIFIED SPHYGMOMANOMETER WITH BAG METHOD AND USING HAND-HELD DYNAMOMETER ON HEALTHY ADULTS
Download
Mostafa Azimi
Comparing clinical indicators and neurophysiological findings of Sural and Peroneal nerves in detection of diabetic neuropathy
Download
Serpil Tuna
The impact of physical therapy on depression and quality of life in musculoskeletal disorders
Download
Serpil Tuna
THE RELATIONSHIP BETWEEN FEMORAL CARTILAGE THICKNESS AND MUSCLE STRENGTH IN KNEE OSTEOARTHRITIS
Download
Akmal Hafizah Zamli
THREE YEARS REVIEW OF NEUROGENIC BLADDER DYSFUNCTION AND ITS COMPLICATIONS A YEAR FOLLOWING SPINAL CORD INJURY
Download
Akmal Hafizah Zamli
DIAGNOSTIC ACCURACY OF SINGLE CHANNEL CYSTOMETRY FOR NEUROGENIC BLADDER DIAGNOSIS FOLLOWING SPINAL CORD INJURY: A PILOT STUDY
Download
Akmal Hafizah Zamli
SEXUAL DYSFUNCTION IN MEN WITH SPINAL CORD INJURY: A SINGLE CENTER EXPERIENCE IN MALAYSIA
Download
Aysegul Ketenci
The Effect of Hypermobility on Musculoskeletal Disordes in Young Adults
Download
Mohaddeseh Azadvari
Myofascial Pain Syndrome as the cause of Acute Radicular Pain: a Case report
Download
Phei Ming Chern
Botulinum Toxin Injection Practice Amongst Rehabilitation Physicians In Malaysia
Phei Ming Chern
A Novel Hospital Based School Holiday Programme in Malaysia
Emine Kaya
A CASE OF UNILATERAL PERONEAL PARALYSIS AFTER SQUAT EXERCISE
Download
Osman Gunduz
ASSESSMENT OF POTENTIAL PREDICTIVE FACTORS FOR SURGERY IN PATIENTS WHO RECEIVED TRANSFORAMINAL EPIDURAL INJECTIONS
Osman Gunduz
DO COMORBID PSYCHIATRIC CONDITIONS AND INFORMATION FORM APPLICATION EFFECT THE RESULTS OF TRANSFORAMINAL EPIDURAL STEROID INJECTION TREATMENT?
Osman Gunduz
FLUOROSCOPY-GUIDED OSTEITIS PUBIS INJECTION: A CASE REPORT
Hikmet Kocyigit
Evaluation of the frequency of coexisting C5-C6 root compression with rotator cuff pathologies
Download
Hikmet Kocyigit
Can Platelet Rich Plasma Be Alternate To Surgery In Patients With Rotator Cuff Tears?
Download
Rou Chen Jee
Functional Outcome of Brainstem Stroke after Complicated Cerebellopontine Angle Tumor Surgery
Download
Rou Chen Jee
Unilateral Hypoglossal Nerve Palsy and Dysphagia Following Cervical Spinal Cord Injury and Anterior Cervical Spinal Surgery
Download
Moshiur Rahman Khasru
Mobility Assessment in Comparison between Early and Late Rehabilitation in Stroke – a Prospective Multicentre Cohort Study in Bangladesh
Download
Khin Nyein Yin
Disability Assessment in Young Children with Disabilities
Leong Be Kim
Cross Sectional Study of Patients with Traumatic Spinal Cord Injury in A Tertiary Hospital: Sarawak General Hospital Experience
Muhammad Hafiz Hanafi
Evaluation of Neural Plasticity effect of Amantidine in post removal Occipital Brain Tumor using MagnetoEncephaloGraphy (MEG)
Download
Natasa Milenovic
EVALUATION OF ASPECT OF SLEEPING PROBLEMS PATIENTS WITH THORACIC OUTLET SYNDROME
Natasa Milenovic
EVALUATION OF ATITUDE OF NURSARY SCHOOL TEACHER ABOUT CEREBRAL PALSY ON ORGANISATION OF HABILITATION AND REHABILITATION PROCESS
Sahibzada Nasir Mansoor
IS IT STROKE? DYSPHAGIA AS THE SOLE PRESENTATION
Download
Sahibzada Nasir Mansoor
BILATERAL RADIAL NERVE INJURY: A UNIQUE AND HORRIFIC CAUSE
Download
Navaporn Chadchavalpanichaya
THE USE OF UCBL ORTHOSIS IN PATIENTS WITH FLATFOOT IN FOOT CLINIC, SIRIRAJ HOSPITAL
Download
Noor Bismillah Ahmad Kasah
EPIDEMIOLOGY OF SPINAL CORD INJURIES IN MALAYSIA TERTIARY REHABILITATION CENTER
Download
Pardis Noormohammadpour
Effect of abdominal resistance exercise on abdominal subcutaneous fat of obese women: a randomized controlled trial using ultrasound imaging assessments
Download
Ravi Sankaran
Hands to the Heart: Challenges in Rehabilitating India's first successful bilateral cadaveric hand transplant
Download
Samah Hassan
Rehabilitation Of Acute Myositis; Does It Matter?
Download
Chui Har Phua
COBB'S ANGLE IMPROVEMENT WITH CUSTOMIZED TLSO AS THE NON-OPERATIVE MANAGEMENT FOR ADOLESCENT IDIOPATHIC SCOLIOSIS (AIS) AND NEUROMUSCULAR SCOLIOSIS (NS) IN REHABILITATION MEDICINE SETTING
Download
Shehadad Kammili
CORRELATION BETWEEN CLINICAL TESTS AND ULTRASONOGRAPHY IN ROTATOR CUFF DISEASE
Download
Deniz Evcik
EMG BIYOFEEDBACK ASISTED LUMBAR STABILIZATION EXERCISES IN OBESE PATIENTS WITH CHRONIC LOW BACK PAIN: A RANDOMIZED, CONTROLLED, PROSPECTIVE STUDY
Download
Deniz Evcik
THE EFFECTIVENESS OF LOW INTENSITY LASER THERAPY ALONG WITH THE SCIATIC NERVE FIELD IN CHRONIC LUMBAR RADICULAR PAIN : A PROSPECTIVE, RANDOMIZED, PLACEBO CONTROLLED STUDY
Download
Deniz Evcik
THE EFFECTIVENESS OF COMBINED TRANSCUTANEOUS ELECTRICAL NERVE STIMULATION AND INTERFERENTIAL CURRENT THERAPY IN CHRONIC LOW BACK PAIN: A RANDOMIZED, DOUBLE-BLIND, PLACEBO-CONTROLLED STUDY
Download
Siti Norzalilah Abdul Majid
THE WALKING MERMAID - MYTH OR FACT?
Soe Soe Khaing
Effect of Therapeutic Ultrasound in Treatment of Plantar Fasciitis
Download
Snezana Tomasevic-Todorovic
ASSESSMENT AND MANAGEMENT OF NEUROPATHIC PAIN IN PATIENTS WITH MUSCULOSKELETAL DISORDERS
Download
Wan Najwa Wan Mohd Zohdi
Cauda Equina Syndrome Following Lumbar Puncture in a Patient With Critical Illness Polyneuropathy : A Case Report
Download
Wan Najwa Wan Mohd Zohdi
Association Between Hand Grip Strength And Ability To Ambulate In Transfemoral And Transtibial Amputees
Download
Yusma Asni Yusmido
A Randomized Control Trial of Functional Outcome In Cardiac Rehabilitation Following Coronary Artery Bypass Graft
Yusniza Mohd Yusof
Disability prevalence in Malaysia
Yulong Bai
Effects of Constraint-Induced Movement Therapy on Brain Glucose Metabolism of Cerebral Ischemic Rats: a micro PET/CT study
Mustafa Kaplan
Misdiagnosed Psoriatic Arthritis: A Case Report
Ioan-Sorin Stratulat
NEUROSURGERY REHABILITATION SCHEMA AFTER SUBARACHNOID HEMORRHAGE: ACUTE POST-ACUTE AND CHRONIC - CASE PRESENTATION
Der-Sheng HAN
Substance P plays a crucial role in the analgesic effect of low level laser therapy on chronic muscle pain
Download
Eri Kobayashi
Risk factor for upper limb dysfunction in patients with head and neck cancer: A 1-year prospective study
Download
Engin Alagöz
CHRONIC RECURRENT MULTIFOCAL OSTEOMYELITIS IMITATING SPONDYLOARTHROPATHY ON BONE SCINTIGRAPHY
Engin Alagöz
Primary sacral lymphoma initally supposed to be sacroiliitis on bone scintigrapy
Eckehard Froese
Quality assurance in medical rehabilitation after musculoskeletal injuries - Concept, methods and first results of a pilot project to compare centers for rehabilitation
Download
Chin-Tsan Huang
PRIMARY NON-HODGKIN'S LYMPHOMA PRESENTING AS RADICULAR SYNDROME: A CASE REPORT
Download
Elzbieta Miller
Analysis of upper limb muscle strenght in the early phase of brain stroke
Emre Ata
DOES KINESIOTAPING INCREASE THE EFFICACY OF THE TREATMENT OF MYOFASCIAL PAIN SYNDROME?
Emre Ata
A COMPLEMENTARY TREATMENT OPTION FOR WHIPLASH INJURIES
Emre Ata
A RARE CAUSE OF MEDIAN NERVE PALSY
Emre Ata
A RARE CAUSE OF SCIATICA
Emre Ata
A CASE OF PARAPLEGIA DUE TO ANTERIOR SPINAL ARTERY OCCLUSION
Emre Ata
RAPID DIAGNOSIS OF HEMARTHROSIS WITH ULTRASONOGRAPHIC EXAMINATION
Emre Ata
TREATMENT OF PULMONARY INVOLVEMENT OF RHEUMATOID ARTHIRITIS WITH ADALIMUMAB
Emre Ata
A RARE CAUSE OF PARAPLEGIA: DRUG ABUSE
Emre Ata
A RARE CAUSE OF LOW BACK PAIN: LIMBUS VERTEBRAE
Emre Ata
A CASE OF A STRESS FRACTURE WITH ATYPICAL LOCATION
Emre Ata
A CASE OF DECREASED RANGE OF MOTION SECONDARY TO NECROTIZING FASCIITIS
Emre Ata
IS DRY-NEEDLING REALLY EFFECTIVE IN THE TREATMENT OF SPASTICITY?
Emre Ata
AN ATYPICAL CASE OF SCHEUERMANN'S DISEASE WITH CERVICAL INVOLVEMENT
Emre Ata
A CASE OF BILATERAL COLLES FRACTURE
Emre Ata
THE IMPORTANCE OF EARLY REHABILITATION OF EOSINOPHILIC FASCIITIS-RELATED JOINT LIMITATIONS
Emre Ata
A RARE CASE: COEXISTINCE OF ANKYLOSING SPONDYLITIS AND RHEUMATOID ARTHRITIS
Emre Ata
A Rare Adverse Event of Adalimumab
Emre Ata
A PRESSURE ULCER SUCCESSFULLY TREATED WITH MEDICAL HONEY DRESSING
Emre Ata
A POTENTIAL SERIOUS COMPLICATION AFTER ASPIRATING LARGE EFFUSION IN WEIGHT-BEARING JOINTS
Emre Ata
A CASE OF NEUROBRUCELLOSIS MISDIAGNOSED AT THE ONSET AS MULTIPLE SCLEROSIS
Emre Ata
A RARE SIDE EFFECT OF ADALIMUMAB
Emre Ata
A CASE OF HODGKIN LYMPHOMA WITH POLIARTHRALGIA AFTER COMPLETION OF CHEMOTHERAPY
Emre Ata
AN ALTERNATIVE TREATMENT OPTION IN THE TREATMENT OF PREGNANCY-INDUCED CARPAL TUNNEL SYNDROME
Emre Ata
IS IT PNEUMONIA OR PULMONARY INVOLVEMET OF RHEUMATOID ARTHIRITIS?
Fatimah Ahmedy
ADAPTATION OF PHYSICAL ACTIVITY PRESCRIPTION AND EXERCISE TRAINING FOR CARDIAC REHABILITATION PROGRAM IN PHYSICALLY DISABLED POPULATION: A CASE SERIES
Download
Fatimah Ahmedy
IMPROVEMENT OF HEART RATE RECOVERY WITH SHORT-TERM EXERCISE TRAINING AT OUTPATIENT CARDIAC REHABILITATION PROGRAM IN POST-CORONARY ARTERY BYPASS GRAFTING SURGERY: A CASE REPORT
Download
Evi Rachmawati Nur Hidayati
EVALUATION OF COUGH ABILITY AFTER PULMONARY REHABILITATION PROGRAM IN COPD PATIENTS
Download
Evi Rachmawati Nur Hidayati
THE CORRELATION OF KNEE PAIN WITH THE ANATOMICAL ABNORMALITY FINDING BY MUSCULOSKELETAL ULTRASONOGRAPHY IN SOUTH JAKARTA - 2015
Download
Fary Khan
MEDICAL REHABILITATION IN MADAGASCAR: CHALLENGES IN IMPLEMENTING THE WORLD HEALTH ORGANISATION DISABILITY ACTION PLAN
Download
Fary Khan
FACTORS ASSOCIATED WITH LONG-TERM FUNCTIONAL AND PSYCHOLOGICAL OUTCOMES, IN PERSONS WITH SEVERE TRAUMATIC BRAIN INJURY
Download
Fateme Hojjati
Co-occurrence of trifid and bifid median nerves in a patient with bilateral carpal tunnel syndrome
Feng Zhen
Expression of orexin A and OX1R in the prefrontal cortex of traumatic brain injury-induced comatose rats after vagus nerve stimulation
Download
Ferdi Yavuz
Sonographic Representation of Bifid Median Nerve
Download
Fengyi Kuo
Health Status of Burmese Refugees Resettled in a Midwest City of the United States of America
Download
Fumihiro Matsuda
The component analysis of toe clearance in the hemiplegic gait
Download
Francesca Gimigliano
FUNCTIONAL IMPAIRMENTS AND DYSMOBILITY SYNDROME IN PATIENTS WITH PREVALENT FRAGILITY FRACTURES: A RETROSPECTIVE CASE-CONTROL STUDY
Download
Sachiko Fujita
Assessment of Exercise Therapy on an Anti-Gravity Treadmill for Postoperative Lower Limb Fracture Patients in Pain
Download
Sayaka Fujiwara
Multidisciplinary approach to children with congenital upper extremity deficiency
Gao Jing
Risk of Cerebral Palsy among Chinese Children: an N:M Matched Case-Control Study
Gavin Williams
METHODS OF ASSESSING ASSOCIATED REACTIONS OF THE UPPER LIMB IN STROKE AND TRAUMATIC BRAIN INJURY: A SYSTEMATIC REVIEW
Download
Germano Pestelli
COMMUNITY BASED REHABILITATION IN ITALY
Download
Gerold Ebenbichler
Test to Retest Reliability of Objective Postural Control Measures in Lung Transplant Recipients
Gerwin Bernhardt
Positive effect of hospital colors on patients' recovery after total hip or knee arthroplasty
Download
Tang-Wei Kuo
Effect of Exercise Training Prevents Renal Fibrosis in Rats with Hypertension
JIHEE KIM
Long-term outcomes of cardiac rehabilitation in elderly and younger patients with myocardial infarction
Download
JiYeon Lee
Functional electrical stimulation in combination with game-based virtual reality for health-related quality of life and upper extremity function: A randomized, single blinded on-going trial
Yoko Goto
THE IMPORTANCE OF “THE MEAL†IN THE REHABILITATION
Download
Jonah Green
BILATERAL LOWER EXTREMITY AMPUTATION AFTER TOXIC SHOCK SYNDROME NOW WITH LOCKED KNEE: A CASE REPORT
Ramesh Kumar
MLC601 (NeuroAiD) for Brain Injuries - Open label Use in a Series of Patients
Download
Genichi Tanino
The effect of the application of belt electrode to the stroke patients for neuromuscular electrical stimulation: a pilot study
Download
Gülümser Aydin
IS THERE A ROLE OF PER3 GENE VNTR POLYMORPHISM AND CLOCK GENE T3111C SNP POLYMORPHISM IN PATHOGENESIS OF FIBROMYALGIA SYNDROME ?
Shi-Jie Huang
Angiogenesis effect of low-level laser in Diabetes Hindlimb Ischemic Mice
M. Habibur Rahman
Effectiveness of Clinical Grading of Osteoarthritis of the Knee & its correlation with Radiological Grading
Download
Abderrazak Hajjioui
Attitudes of care providers against persons with disabilities
Download
Abderrazak Hajjioui
Interest of Constraint-induced movement therapy in the rehabilitation of children with Erb's Palsy
Download
Abderrazak Hajjioui
Children with disabilities in Morocco : Epidemiological and clinical profile
Download
Kozo Hanayama
Laryngeal elevation time measurement from the skin surface using a newly-developed infrared Laser instrument
Yukihiro Hara
Brain plasticity for upper extremity function induced by the electromyography-controlled functional electrical stimulation among stroke patients
Haruhi Inokuchi
Pre- and post-operative cervical range of motion in patients with cervical myelopathy measured by three-dimentional motion analysis system
Zahra Hashemi
RESEARCH STATUS ABOUT PLATELET RICH PLASMA APPLICATIONS AND ITS EFFECTS IN MUSCULOSKELETAL DISORDERS IN IRAN
Download
Ainil Hawa Ibrahim
SUCCESSFUL REHABILITATION PROGRAM FOR CHRONIC SPINAL CORD INJURED PATIENT : A CASE REPORT
Download
Satoshi Hayamizu
Treatment of dystonic clenched fist with botulinum toxin: A case report of a patient with Parkinson's disease.
Download
Helene Høye
MINDFULNESS BASED TECHNIQUES IN A GROUP SETTING OF PATIENTS WITH SEVERE AND NEWLY ACQUIRED PHYSICAL INJURIES
Download
Yuka Kurihara
An important attention for Botulinum toxin type A treatment improved painful flexor toe caused by stroke spasticity: A case report
Download
Hi Chan Lee
Can syringomyelia change the sensation of temperature in upper extremity? -Single case study-
Hideaki Itoh
Cilostazol decreases the function of norepinephrine and serotonin transporter, which is known as cellular target of antidepressants
Hideto Okazaki
Prognosis of dysphagia after thalamic hemorrhage in post-acute rehabilitation hospital
Hiroaki Inoue
Quantitative evaluation of revascularization after anterior cruciate ligament reconstruction
Satoshi Hirano
The effect of robotic assist on stance and swing in hemiplegic gait
Hiroyuki Maeda
Motor complication based on the amount of movement after tourniquet avascularization
Hitoshi Kagaya
Shaker exercise combined with integrated volitional control electrical stimulation: a randomized controlled trial
Mamiko Harimoto
Factors affecting the ambulatory function at discharge in patients with postoperative chronic subdural hematoma
Download
Hiroyuki Miyasaka
Effect of robot-aided training with electrical stimulation on functional improvement of hemiplegic upper limb of sub-acute stroke patients
Download
Li Hongling
EFFECT OF DIFFERENT ATMOSPHERENT ABSOLUTE HYPERBARIC OXYGEN ON THE EXPRESSIONS OF BCL-2 AND BAX IN RATS WITH INTRACEREBRAL HEMORRHAGE
Ohnmar Htwe
QUALITY OF LIFE (QOL) AMONGST PATIENTS WITH DIABETIC FOOT PROBLEMS TREATED AT TERTIARY HOSPITAL, MALAYSIA
OHNMAR Htwe
Spinal cord injury - Assessing Tolerability and Use of combined Rehabilitation and MLC601or MLC901 (SATURN Study)
Ohnmar Htwe
A STUDY OF HUMAN ACTIVIN A TYPE 1 RECEPTOR (ACVR1) AND NOGGIN (NOG) GENE MUTATION IN DEVELOPMENT OF NEUROGENIC HETEROTOPIC OSSIFICATION POST TRAUMATIC BRAIN INJURY
OHNMAR Htwe
A Pilot Study to Explore the Physical Needs of School Going Children With Spina Bifida at the Tertiary Hospital, Malaysia
OHNMAR Htwe
Clinical Presentations and Physical Functioning of Children with Spina Bifida in Tertiary Hospital, Malaysia
Hye Jung Park
BILATERAL RADIAL NEUROPATHY IN THE NEWBORN : A CASE REPORT
Husnul Mubarak
CLINICOFUNCTIONAL CLASSIFICATION OF STROKE SURVIVOR : PROPOSED CLINICAL AND FUNCTIONAL PARAMETERS OF STROKE SURVIVORS
Download
iin kamelia rambe
A CASE REPORT: REHABILITATION IN MANAGEMENT OF ARTHROGRYPOSIS
Download
Yasunori Ikenaga
Effects of the use of RACOL-NF Semi Solid enteral formula and an adaptor on nursing workload
Download
Indah Wardhani
Baseline Core Muscle Strength of Low Back Pain Patients as Measured by 3D Newton Machine at Siloam Hospital Kebon Jeruk, a Preliminary Study
Download
Indah Wardhani
Core Muscle Strength Improvement of Low Back Pain Patients after training with 3D Newton Machine at Siloam Hospital Kebon Jeruk, a Preliminary Study
Download
Mark Lissens
CLINICAL AND ELECTROMYOGRAPHICAL FINDINGS IN PATIENTS WITH POST POLIOMYELITIS SYNDROME
Download
Hirofumi Maeda
Factors influencing the therapeutic effectiveness of phenol motor point block in patients with cerebrovascular disorders using ankle plantar flexion torque
Takashi Isaji
Cardiovascular physiological changes in scuba diving - Analysis of disabled male divers due to TBI
Download
Ivan Vareka
HOW EFFECTIVE IS THE REPEATED IN-PATIENT REHABILITATION IN THE LOWER EXTREMITY AMPUTEES?
Download
Atsushi Iwashita
Rehabilitation after the multi joint arthroplasty (bilateral THA and bilateral TKA)
Download
Jamie Joseph
Community integration after traumatic brain injury - A Malaysian perspective
Download
Javvad Haider
Delirium in a Spinal Injury Rehabilitation Setting
Download
Javvad Haider
An Unusual Combination: Spinal Cord Injury in 2 patients with Advanced Huntingtons Disease
Download
Jeannine Bergmann
Effects of robot-assisted gait training on pusher behavior in subacute stroke patients: a randomized controlled clinical trial
Jennifer O’Riordan
A SURVEY ON ATTITUDES TOWARDS INPATIENT REHABILITATION
Download
Jennifer ORiordan
VASCULAR DEMENTIA: EXPLORING THE TIMELINE
Download
Jack FU
Evaluating Disability Insurance Assistance as a Specific Intervention by Physiatrists at a Cancer Center
Download
Joudy Gessal
EFFECT OF LOW-INTENSITY PULSED ULTRASOUND ON COLLAGEN DEGRADATION IN MILD TO MODERATE KNEE OSTEOARTHRITIS: A RANDOMIZED CONTROLLED STUDY
Download
Jung Keun LEE
Ambulatory measurement of human body orientation based on inertial and magnetic sensor for physical medicine and rehabilitation
Download
John Speed
BEHAVIORAL MANAGEMENT OF CONVERSION DISORDER
Download
Joonnyong Lee
NOVEL PRESSURE SENSOR DEVICE TO MEASURE AND TRAIN ABDOMINAL BRACING
Chul Jun Kim
THE EFFECTIVENESS OF LEAP MOTION FOR UPPER ARM REHABILITATION AFTER STROKE : SINGLE CENTER, PROSPECTIVE PILOT STUDY
Chul Jun Kim
THE EFFECTS OF POSTOPERATIVE MYOFASCIAL RELEASE THERAPY FOR BREAST CANCER PATIENTS : SINGLE CENTER, PROSPECTIVE OBSERVATIONAL PILOT STUDY
Junichiro Shiraishi
Sonographic investigation of trunk muscles of Parkinson's disease patients with Pisa syndrome
Junji Nishimoto
Factors influencing the outcome of patients with burn injuries
Download
Kenji Kagechika
Estimation Method of Volume and Trabecula Architecture of Cancellous Bone in Hemiplegic Patients
Kenji Kagechika
A stroke patient with persistent disturbance of consciousness who recovered from cervical dystonia and could communicate by using botulinum toxin type A treatment.
Kenji Kagechika
Utility of mirror treatment method with digital image display device in stroke patients with upper arm dysfunction.
Kenji Kagechika
Relationship between the skin impedance of stroke patients and pain measurement
Zheng Caixia
ELECTROACUPUNCTURE IMPROVES SYNAPTIC PLASTICITY VIA ACTIVATION OF cAMP/PKA/CREB PATHWAY IN HIPPOCAMPUS CA1 AREA IN RATS WITH VASCULAR DEMENTIA
Download
Karen Chua
Evaluation of upper limb outcomes after combinatory training using robot-assisted therapy with standard arm therapy for severe poststroke hemiparesis
Masaki Katoh
Comparison of gait capacity between the WPAL exoskeleton and conventional orthoses in persons with paraplegia
Download
Kenji Kawakami
EFFECT OF GREATER AMOUNT OF TRAINING ON THE IMPROVEMENT OF WALKING ABILITY OF HEMIPREGIC PATIENTS IN COMPREHENSIVE INPATIENT REHABILITATION
Download
Mikiko Kawamura
Characteristics of the Motor Development of Autism Spectrum Disorder Children until the Unassisted Walking Stage
Download
Nobuyuki Kawate
Evaluation of gait in stroke patients with spastic hemiparesis after the therapy of Botulinum toxin type A (BoNT-A)
Download
Keewon Kim
Predictive Value of Intraoperative Bulbocavernosus Reflex During Untethering Surgery for Post-operative Voluntary Voiding
Keiko Aihara
Kinematic analysis of tongue-hold swallow in healthy subjects Analysis using 3D dynamic Computed Tomography
Kelvin Cheng
DIFFERENCE IN FOOT PLANTAR PRESSURE BETWEEN BIPEDAL WALKING AND WALKING ON SINGLE LIMB WITH WALKING FRAME OR CRUTCHES
Teik Beng Khoo
IS BOTULINUM TOXIN INJECTION EFFECTIVE IN PREVENTING PROGRESSION OF HIP DISPLACEMENT IN CHILDREN WITH SEVERE CEREBRAL PALSY?
Thomas Kienbacher
Age and gender related neuromuscular and kinematic pattern during trunk flexion-extension in chronic low back pain patients
Download
shin kyoung kim
Foot Edema in Hemiplegic Patients after Stroke : Incidence and Correlation between Edema and Various Measures
Download
Yuu Kitaji
When and how can we predict the outcome of acute stage of stroke patients?
Download
Takaaki Kakihana
Gait abnormalities in patients with aortoiliac occlusive disease
Satoshi Kamada
Sports and Physical Activities of Elderly Patients with Knee Osteoarthritis after High Tibial Osteotomy
Download
Al Hafiz Ibrahim
The effects of Cardiac Rehabilitation on erectile dysfunction in men with ischaemic heart disease: a prospective cohort study
Takeshi Nakamura
Noninvasive positive pressure ventilation improves the effects of aerobic training on cardiopulmonary function
Koki Fukuhara
Evaluation of Endurance in Healthy Individuals and Amputee Football Players Using an Ergometer with One Leg and Both Arms
Download
Tetsuo Koyama
Predictive accuracy of Harris-Benedict equation for resting energy expenditure in patients with cerebral infarct during acute care
Kotaro Takeda
Estimation of viscoelasticity and muscle contraction components during passive ankle dorsiflexion for evaluating spasticity
Kutay Tezel
Horner's syndrome with unilateral brachial plexus lesion caused by gunshot penetrating trauma
Kutay Tezel
Unilateral both femoral head and condylies avascular necrosis due to chemotherapy and pelvic radiotherapy in malign melanoma patient
Kudret Yelden
HETEROTOPHIC OSSIFICATION FOLLOWING SEVERE ACQUIRED BRAIN INJURY-AUDIT OF CURRENT PRACTICE
Kulwarang Wongwilairat
Effectiveness of stretching exercise with deep and slow breathing for therapeutic enhancement: A qualitative study
Kunj Patel
Raynaud's Phenomenon Leading to Dry Gangrene
Download
Kunj Patel
Recurrent Discitis in the Acute Rehab Setting
Download
Youn Kyojun
Factors Affecting the Early Recovery of Balance Function in Stroke patients.
Download
Lorenzo Garavaglia
Assessment of dynamic orthotic upper-limb rehabilitation by means of on-board sensors
Download
Chung-Liang Lai
The immediate effect of whole body vibration on spasticity in stroke Patients -- A pilot study
Laura Smith
Comparison of Rehabilitation Outcomes Following Falls Related and Traumatic Spinal Cord Injury at the Midland Centre for Spinal Injuries (MCSI)
Laura Smith
Goal Planning Meetings (GPM) At The Midland Centre For Spinal Injuries, UK: Function And Patient Satisfaction
Laura Smith
Non Traumatic Spinal Cord Injuries Compared to Traumatic Spinal Cord Injuries - are there different rehabilitation outcomes?
Li-Ling Chuang
Comparative Efficacy of Electrical Stimulation Combined with Bilateral Arm Training on Hemiplegic Shoulder Pain and Arm Function in Individuals with Stroke
Jung Ah Lee
A STUDY ON USER SATISFACTION WITH ELETRIC WHEELCHAIR
Download
Yang-Soo Lee
Strengthening using sliding rehabilitation machine: A feasibility study of stroke patients with sensory aphasia
Download
Jin Park
Cellular and Molecular Regulation in the Brain after Spinal Cord Injury
Lijuan Ao
The effects of offspring's behavior and serotonin circuitry during the lactation rats exposure to fluoxetine
Download
Ling Lan
Visual and Hearing Impairment In the Setting of Intensive Rehabilitation
Download
marcela lippert-gruener
The use of botulinumtoxin in the therapy of neuropathic pain - case study
Download
marcela lippert-gruener
The role of behavioural disturbances in stroke rehabilitation
Download
Jan Michael Lleva
Ultrasound-Guided Cutaneous Nerve Hydrodissection and Corticosteroid Injection as Adjunct Treatment for Chronic Anterior Knee Pain: A Case Report
Bei Zhang
Effects of Transcutaneous Electrical Acupoint Stimulation (TEAS) on Motor Functions in Children with Cerebral Palsy: a preliminary study
Lonwabo Lungile Godlwana
A CONCEPTUAL FRAMEWORK TO STUDY LOWER LIMB AMPUTATION (LLA) IN JOHANNESBURG, SOUTH AFRICA
Download
Yi-Ming LO
Acute effects of Kinesio taping on low back pain and back muscle endurance in patients with lumbar disc degeneration: a controlled clinical trial
Download
Luca Labianca
Assessing children with disabilities using ICF-CY underwent a new aquatic rehabilitation protocol
Download
Luca Labianca
Gross Motor Function Measure and Hammersmith scale in assessing children affected by SMA II underwent a new aquatic protocol
Download
Siew Kwaon Lui
Rehabilitation of Neurological Complications in Severe Malaria: A Case Report
Indrayuni Lukitra Wardhani
CORRELATION BETWEEN EXPRESSION OF HSP 70 AND OPIOID Mu RECEPTOR IN LOW- LEVEL LASER THERAPY
Download
Wei-Chih LIEN
Could rehabilitation prevent depression incidence after spinal cord injury? – A population-based cohort study
Zhenhuan Liu
The clinical research of early intervention to cerebral sub-health infants by Traditional Chinese Medicine
Download
Mónica Alcobendas Maestro
Spinal cord injury during pregnancy
Download
Mónica Alcobendas Maestro
Neurological worsening after surgery of spinal canal stenosis
Download
Monica Pinto
Urinary incontinence and quality of life in prostate cancer
Monica Pinto
Urinary incontinence and quality of life in prostate cancer
Miyuki Matsumoto
Effect of Cutaneous Acupuncture Stimulations on Gait Pattern in Patients with Chronic Hemiparesis
Maha Emad
Comparing the Effectiveness of Yoga and High Intensity Interval Training on Weight Related Outcomes in Female Medical Students in Suez Canal University
Download
Su Jin Choi
Leukoaraiosis and Functional Outcome in Patients with Subcortical Infarct
Download
Maiko Yagi
Impact of Timing and Intensity of Rehabilitation on Short-term Outcomes in Patients with Acute Ischemic Stroke: A nationwide retrospective cohort study in Japan
Download
Marieke Coussens
Cross-validation and cultural adaptation of the Flemish version of the Participation and Environment Measure of Children and Youth (PEM-CY)
Download
Hélène Marsollet
Moderate and severe TBI pathways of care after discharge from ICU in french area : What compliance with french recommendations ?
Marta Niwald
Impact of aerobic training on cognitive and motor functioning in patients with multiple sclerosis. A case-control study.
Download
Masaaki Onishi
Short-term Clinical Results of Bilateral Total Knee Arthroplasty (TKA)
Download
Mazlum Serdar Akaltun
Radial Head Dislocation in a Stroke Patient with Unknown Etiology
Levent Tekin
Auricular acupuncture for treating fibromyalgia
Levent Tekin
The effect of dry needling in patients with non-specific shoulder pain: Results of an ongoing study
Levent Tekin
Prolotherapy for musculoskeletal Diseases: A single-center one-year analysis
Levent Tekin
A SUBCUTANEOUS HEMATOMA AS A COMPLICATION OF DRY NEEDLING
Meimei Zhou
Preliminary study on efficacy of Neuromuscular Electrical Stimulation and Transcutaneous Nerve Stimulation in Hemiplegic Shoulder Pain
Download
Sri Mardjiati Mei Wulan
FEEDING AND SWALLOWING PROFILE IN CEREBRAL PALSY CHILDREN IN PMR OUTPATIENT CLINIC: a preliminary study.
Siswarni Jusuf
Effectiveness of Foot Abduction Brace (FAB) produced by Prof Dr R Soeharso Orthopaedic Hospital as Correction maintenance for Idiophatic Club Foot
Download
Mary Monica Bernardo
EFFECT OF COLLAGEN HYDROLYSATE AS ADJUVANT TREATMENT TO EXERCISE FOR KNEE OSTEOARTHRITIS
Download
Chen-Ya Yang
Application of Cardiopulmonary Test in Patients with Late-onset Pompe Disease under Enzyme Replacement Therapy
José Antonio Mirallas Martinez
EXTRACORPOREAL SHOCK WAVE THERAPY IN CALCIFIC ROTATOR CUFF TENDINOSIS
Download
José Antonio Mirallas Martinez
EXTRACORPOREAL SHOCK WAVES THERAPY IN PLANTAR FASCIITIS
Download
José Antonio Mirallas Martinez
EXTRACORPOREAL SHOCK WAVES THERAPY IN LATERAL EPICONDYLITIS
Download
Miaoju Hsu
A preliminary study on comparisons of physical performances for acute myocardial infarction inpatients after percutaneous coronary interventions or coronary artery bypass grafting
Miaoju Hsu
One-leg versus two-leg symptom-limited cycling tests in subacute stroke patients: A preliminary study
Marija Knezevic-Pogancev
CEREBRAL PALSY AND EPILEPSY
Marija Knezevic-Pogancev
PARENTS FEAR OF ANTIEPILETPIC DRUG WITHDRAWN IN CHILDREN WITH CEREBRAL PALSY
Min Kyun Sohn
Comparison of Functional Recovery in Stroke According to the Transfer to Rehabilitation Department: Korean Stroke Cohort study
Download
Ma. Lorraine Buenavente
THE DIAGNOSTIC ACCURACY OF ULTRASONOGRAPHY IN CARPAL TUNNEL SYNDROME: A SYSTEMATIC REVIEW AND META-ANALYSIS
Download
Mohankumar Mariappan
Service evaluation study of early mortality post-discharge from regional spinal injuries unit, Oswestry, United Kingdom
Download
Mohankumar Mariappan
Musculoskeletal Interface Service : A novel biopsychosocial model to manage musculoskeletal disease at the primary-secondary interface in North Midlands, United Kingdom
Download
Mohankumar Mariappan
Amputee Rehabilitation for Non-Prosthetic Users
Download
Mohankumar Mariappan
Transient Bone Marrow Oedema Syndrome: Report of four cases in a year from North Midlands, United Kingdom
Download
Mohd Azmarul A Aziz
Demographic and Clinical Profiles of Patients with Aphasia in Malaysia: A Preliminary Data
Download
Mohd Azmarul A Aziz
Paediatric Speech and Language Disorders in Malaysia: A Preliminary Study
Download
Mohd Izmi Ahmad
A Pilot Randomized Control Cross over Study Evaluating the Effectiveness and Safety of Mechanical Percussor Compared with Conventional Chest Physiotherapy in Adults with Productive Cough
Wen-Chih Lin
Reasons for admission among people with cerebral palsy in different age categories
Wen-Chih Lin
Difference between Women and Men in Phase I Cardiac Rehabilitation after Acute Myocardial Infarction: A Nationwide Population-based Analysis
Motohiko Banno
Natural killer cell activity in persons with cervical spinal cord injury increased after the wheelchair half marathon race
Download
Mouna Sghir
Rehabilitation care of the adhesive capsulitis of the shoulder in diabetic patients: A comparative study with the idiopathic form
Mouna Sghir
Rehabilitation care of hemophilic arthropathy: a case report
Mouna Sghir
L5 nerve root compression secondary to a sacral fracture: a case report
Mouna Sghir
L5 Painful minor intervertebral dysfunction (PMID), uncommon cause of knee pain
Mouna Sghir
Legg-Calve-Perthes disease: two cases reports
Mouna Sghir
Association of Osgood-Schlatter disease and Sever's disease: a case report
Mouna Sghir
Association of Takayasu's disease and juvenile rheumatoid arthritis: a case report
Mohamed Sakel
A durable gain in motor and non-motor symptoms of Parkinson's Disease following repeated caloric vestibular stimulation: A single-case study
Download
Marta Supervia Pola
MUSCULOSKELETAL LIMITATIONS AND PARTICIPATION IN CARDIAC REHABILITATION
Mikio Muraoka
Validity of a postoperative rehabilitation program for distal radius fractures
Download
Hirotaka Mutsuzaki
Anatomical single-bundle anterior cruciate ligament reconstruction using calcium phosphate hybridized tendon graft in goats
Download
Martin Weigl
Effects of a 3-Week Multidisciplinary Biopsychosocial Rehabilitation in Chronic Neck Pain: A Naturalistic Prospective Cohort Study with Intraindividual Control of Effects
Download
Nabilah Abdul Rahman
LONG TERM OUTCOMES IN DIABETIC CHARCOT FOOT
Download
Nadwah Onwi
Systematic Review: Malay Core Vocabulary for Augmentative and Alternative Communication (AAC) Intervention
Download
Yusuke Nanri
The effect of combination therapy (botulinum therapy, orthosis, repetitive transcranial magnetic stimulation and occupational therapy) in post-stroke outpatients with spastic upper limb hemiparesis
Natiara Mohamad Hashim
Effectiveness of Manual Wheelchair Training Program: A Before and After study trial
Download
Nazirah Hasnan
DISABILITIES WITH A POSITIVE OUTCOME? LESSONS FROM ANCIENT WAYS
Download
Nel LARA
Ocular manifestation of myotonic dystrophy
Download
Nel LARA
Perception of pain during electrodiagnostic tests
Download
Neelufar Rahman
RELIABILITY AND VALIDITY OF FUNCTIONAL INDEPENDENCE MEASURE (FIM) IN STROKE PATIENTS
Download
Rustambek Matmurodov
Factors affecting the quality of life in patients with Parkinson's disease
Nor Faridah Ahmad Roslan
Prognostic Implications in Phase I Cardiac Rehabilitation
Download
Noor Hafifi Noor Hisham
FACTORS ASSOCIATED WITH FATIGUE AMONG PERSONS WITH SPINAL CORD INJURY: A SYSTEMATIC REVIEW
Download
Oksana Tondiy
USE OF THE NON-MEDICATION ON THE TREATMENT OF ACUTE DISCOGENIC LOW BACK PAIN
Download
Andreas Nikolaou
Effectiveness of a multimodal-intervention trial for Breast cancer survivors with chronic cancer-related fatigue to let randomize in terms of decision
Kannit Pongpipatpaiboon
KINEMATIC ANALYSIS OF THE EFFECT OF ANKLE-FOOT ORTHOSIS ON THE HEMIPARETIC GAIT PATTERNS
Noeniek Noegraheni
THE EFFECT OF LOW-LEVEL LASER THERAPY ON PAIN IN CARPAL TUNNEL SYNDROME
Download
Nurhaida Rosley
Muscle Size and Strength Benefits of Functional Electrical Stimulation-Evoked Lower Limb Cycling Exercise among Individual with Spinal Cord Injury: A Narrative Review
Download
Mustapa Amirah
A REVIEW OF POSTURAL CONTROL AND GAIT PATTERN IN THE DIABETIC PERIPHERAL NEUROPATHY : A NARRATIVE REVIEW
Download
Hisae Onaka
Comparison of effect on Botulium toxin A after multiple injections in the upper limb
Download
Seng Kwee Wee
IS THERE A RELATIONSHIP BETWEEN TRUNK CONTROL AND RECOVERY OF UPPER EXTREMITY IN THE FIRST 6 MONTHS POST STROKE?
Manmohan S Dhillon
LIFE EXPECTANCY AND THE LAWbyMr Manmohan S DhillonAdvocate & Solicitor Malaysia
Tomoyuki Ogino
Work of breathing during arm bracing in normal subjects
Download
Kei Ohtsuka
The effects of handrails on the treadmill-walking of hemiplegics
Kuo Ghee Ong
Peripheral nerve ultrasound in Charcot-Marie-Tooth (CMT) patients: correlation with functional parameters
Koichiro Sota
The effect of rehabilitation with functional electrical stimulation for stroke patients: a prospective observational pilot study
Download
Abbas Orand
New Analysis Method for the Assessment of Tasks Performed using an Arm Robot
Download
Kayo Hiruta
A study on effectiveness of locomotor training using wearable robot HAL in acute phase stroke patients
Download
Mazatulfazura SF Salim
Cardiovascular autonomic dysfunction Peripheral Vascular Disease Patients
Mari Osaki
The impact of venous thromboembolism on the post-operative rehabilitation after total knee replacement
Hanan Osman
The Use Of DOLS In The Phoenix Rehabilitation Centre
Download
Hanan Osman
Management of Pain in a Neurorehabilitation Unit
Hanan Osman
Management of Patients with Spinal Injuries in The Phoenix Centre
Hanan Osman
Prevalence and Management of UTIs at The Phoenix Centre
Patricia Maria Kurniawati
THE EFFECT OF TOMATO JUICE ADMINISTRATION COMBINED WITH PHYSICAL EXERCISE ON NEURON CELL NUMBER OF POSTMENOPAUSAL RAT BRAIN
Download
Patricia Maria Kurniawati
THE EFFECT OF FEAR OF FALLING TO FUNCTIONAL MOBILITY AND BALANCE OF COMMUNITY-DWELLING ELDERLY
Download
Patrick Brzoska
Why some Kurdish health care users in Germany decide not to use rehabilitative services although they would like to: a qualitative study
Download
Pauline Ong
Antibiotic Usage of Patients with Urinary Tract infection in Hospital Rehabilitation Cheras
Download
THOUMIE Philippe
Age-dependent gains after balance training in ataxic neuropathies
Han Ram Pak
AN INVESTIGATION OF CARETAKERS NEEDS FOR THE IMPROVEMENT OF ELECTRIC WHEELCHAIR
Download
Agus Prasetyo
THE EFFECT OF ELECTRICAL STIMULATION, RESISTANCE EXERCISE AND ELECTRICAL STIMULATION PLUS RESISTANCE EXERCISE TO DISUSE ATROPHY IN INCREASING SOLEUS MUSCLE FIBERS DIAMETER OF RATTUS NORVEGICUS
Download
Shinichiro Morishita
Relationship between physical activity and physical function in allogeneic hematopoietic stem-cell transplantation patients
Download
Shinichiro Morishita
Physical function and health-related quality of life of patients undergoing surgical treatment for malignant pleural mesothelioma
Download
Puteri Nur Farhana Hamdan
Ankle-foot orthosis constrained movements does not alter power output during functional electrical stimulation cycling in paraplegic
Download
Lin Qiang
A Survey of Speech-Language-Hearing Therapists' Career Situation and Challenge in Mainland
Download
Quoc Tran
Identifying Nonhereditary Myositis Ossificans Traumaticus in a Community hospital
Download
Rabiatul Adawiah Abdul Rahman
EFFECTS OF CONCURRENT-TASK ON GAIT PERFORMANCE IN CHILDREN WITH TRAUMATIC BRAIN INJURY: A NARRATIVE REVIEW
Download
Marzieh Babaee
ATTITUDE, BELEIFS AND KNOWLEDGE OF IRANIAN PHYSIATRIST TOWARD EVIDENCE BASED MEDICINE AND IT’S BARRIERS. A CROSS-SECTIONAL STUDY
Download
Joon Shik Yoon
Correlation between Magnetic Resonance Imaging and Electrodiagnosis of Brachial Plexopathy
Joon Shik Yoon
Ultrasonographic Diagnosis of Carpal Tunnel syndrome: Which is the most valuable variable?
Jan Reinhardt
DISABILITY AND ENVIRONMENTAL FACTORS IN SPINAL CORD INJURED 2008 WENCHUAN EARTHQUAKE VICTIMS SEVEN YEARS AFTER THE DISASTER
Download
Sora Baek
Isometric back extensor strength as protective role of back pain
Retno Setianing
Active Therapy for Chronic Low Back Pain among Coal Miners, a Retrospective Case Series
Download
Risa Harada
Evaluating motor function and biomarkers of Fukuyama Congenital Muscular Dystrophy
Kikuo Ota
The test-retest reliability of the Quality of Life after Brain Injury in Japanese version; QOLIBRI-J and QOLIBRI-OS-J are excellent
Rolando Lazaro
Reliability and Validity of the Upright Motor Control Test in Adults with Chronic Stroke
Rolando Lazaro
Sensitivity to Change in the Knee Extension Component of the Upright Motor Control Test in an Adult with Chronic Stroke: A Case Report
Dong Hwee Kim
SONOANATOMY OF ULNAR NERVE AROUND THE ELBOW IN HEALTHY SUBJECTS
Ronald Cua
Correlation Between Pain and Radiographic findings in Knee Osteoarthritis
Rezvan Mirsafaei Rizi
IDENTIFYING RISK FACTORS FOR INJURIES IN UNIVERSITY RUGBY PLAYERS
Download
Rwahita Satyawati
CERVICO AS ALTERNATIVE TREATMENT OF GERIATRIC PATIENTS WITH CERVICAL RADICULOPATHY
Download
Kwang Jae LEE
Severity correlation between ultrasonographic cross section area and electrophysiologic parameters in carpal tunnel syndrome
Download
Kwang Jae LEE
A comparison of popliteal artery between fracture and non-fracture side by ultrasound in patients with femur fracture
Download
Ryuhei Furukawa
Scapula-Spine Distance as a predictor of improvement of shoulder abduction after modified radical neck dissection with preservation of accessory nerve
Ryuji Kobayashi
Acceptance of elementary school students with developmental disorder and needs for rehabilitation specialist support at after-school childcare program
Download
Syoichi Tashiro
The effect of the sensory disturbance and the dynamic foot pressure on the plantar ulcer in the patient with Hansen's disease
Simone Pittaccio
Pilot study on the role of passive and assisted ankle joint motion by a portable device for bedridden paediatric patients affected by upper motoreuron lesions
Download
Fumio LIU
Development of Brain machine interface (BMI) robot therapy for shoulder flexion movement in patients with hemiparetic stroke
Fumio LIU
Development of quantitative method to evaluate thoracoabdominal movement using Fiber grating sensors
Chen Chia Yang
The effects of low- and high-fluence laser therapy on cartilage degeneration in rats with adjuvant-induced arthritis
Sabine Versayanti
Use of complementary and alternative medicine in persons with spinal cord injury in Indonesia: a survey study
Download
Satoru Saeki
Combination therapy with central and peripheral simultaneous electrical stimulation on stroke patients with hemiplegic arms
Download
Selim Akarsu
A rare diagnosis of hand and foot deformity: Pachydermoperiostosis
Selim Akarsu
THE EFFICACY OF KINESIOTAPING IN THE TREATMENT OF LOW BACK PAIN ASSOCIATED WITH PREGNANCY
Selim Akarsu
DIFFUSE EDEMA IN ANTERIOR COMPARTMENT OF THE THIGH THAT WAS MISDIAGNOSED AS MYALGIA
Samira Lahrabli
Epidemiological and etiological profile of shoulder pain in physical medicine experience of physical medicine and functional rehabilitation CHU Ibn Rochd Casablanca Morocco: about 100 patient
Download
Samira Lahrabli
Compression of the posterior interosseous nerve at the elbow by a deep lipoma: about a case and review of the literature
Download
Samira Lahrabli
unusual location of the chondromyxoid fibroma
Download
Sana Salah
EFFECTS OF BALANCE REHABILITATION ON POSTURAL CONTROL IN A STROKE PATIENT WITH IDIOPATHIC PARKINSON'S DISEASE
Sana Salah
RHYTHMIC AUDITORY STIMULATION AND FUNCTIONAL REHABILITATION IN STROKE PATIENTS
Sara Aley Easaw
The Role Of Inpatient Rehabilitation Medicine Intervention in Chronic Stroke
Download
Dian Marta Sari
CAREGIVER CHARACTERISTIC OF PEDIATRIC CASE IN PHYSICAL MEDICINE AND REHABILITATION DEPARTMENT, HASAN SADIKIN GENERAL HOSPITAL, BANDUNG, INDONESIA
Download
Saul Geffen
IMAGE GUIDED INJECTIONS OF BOTULINUM TOXIN TO BLOCK PAIN PATHWAYS
Download
Hiroyuki Yamamoto
The sliding phenomenon of the knee faces on the gait ~The observation in the sagittal plane ~
Download
Marek Kiljanski
The evaluation of physiotherapy procedure in patients treated surgically for idiopathic degenerative knee disease by total knee arthroplasty
Marek Kiljanski
Assessment of the body balance after cryostimmulation in patients with osteoarthritis of the lower spine
Marek Kiljanski
Assessment of the efficacy of local cryotherapy in children with cerebral palsy
Michaela Tomanova
LUMBAR SPINE MUSCULOSKELETAL LOADING - BIOMECHANICAL EFFECT OF ORIGINAL REHABILITATION METHOD
Kei Setogawa
Analysis of timing of peak muscle activity during walking in patients with severe knee osteoarthritis
Download
Seyed Reza Saeidian
Evaluating the correlation between pain, clinical symptom, and electrodiagostic severity in carpal tunnel syndrome
Download
Seyed Reza Saeidian
Comparing the Electodiagnostic changes between Traumatic Facial Nerve Palsy with Bell's palsy
Download
Seyed Reza Saeidian
Comparing the Effect of Three Types of Treatment for Hand Grip Disability among Patients with Traumatic Brain injury
Download
Seyed Reza Saeidian
Comparing two methods of treatment of spastic upper limb after stroke- disport injection with the methods of accompanying a stretching exercise to the disport alone
Download
Shiau-Fu Hsieh
Sport Clinic for Disabled Sports Athletes - a Pilot Study
Download
Shankar Ganesh
Outcome of a multidisciplinary rehabilitation in the management of a woman with knee osteoarthritis in India using the International Classification of Functioning, Disability and Health
Download
Jie Jia
Bilateral Transcranial Direct Current Stimulation Improving Hand Dysfunction After Chronic Stroke
Jie Jia
The Effect of Jin' s Triple-needle Therapy on Alpha Rhythm Power of Stroke Patients and Motor Movement Function
Jie Jia
Different frequency of electric acupuncture treatment of hand the influence of the blood flow velocity in patients with cerebral apoplexy
Jie Jia
Decreased functional connectivity of homotopic brain regions in chronic stroke patients: A resting state fMRI study
Jie Jia
THE VIDEO GUIDED MIRROR THERAPY FOR THE TREATMENT OF HAND IMPAIRMENT OF CHRONIC STROKE PATIENT, A CASE REPORT
Sharifah Hanisah Wan Mohamad Akbar
CHARCOT NEUROARTHROPATHY OF THE KNEE JOINT: A CASE REPORT
Download
Mei-Ling Sharon Tai
PREVALENCE OF IRRITABLE BOWEL SYNDROME IN HEADACHE PATIENTS
Mei-Ling Sharon Tai
PSEUDONEGLECT IN NORMAL YOUNG AND OLDER ADULTS IN UNIVERSITY MALAYA MEDICAL CENTRE
Shigehiro Inoue
Prevention of DVT after joint arthroplasty
Download
Shigeto Watanabe
Rehabilitation effect for the old dementia patients with postoperative proximal femoral fracture
Download
Shimako Yanagisawa
BOTULINUM TOXIN TYPE-A (BONT-A)EFFECTS ON GAIT IN STROKE PATIENTS WITH SPASTIC HEMIPARESISBOTULINUM TOXIN TYPE A (BONT-A) EFFECTS ON GAIT IN STROKE PATIENTS WITH SPASTIC HEMIPARESIS
Download
Yukiyo Shimizu
Investigation of deep tissue injury in Japanese female wheelchair basketball players
Download
Shin-Da Lee
Effects of frequency following response on academic performance and sleep quality among school children
Download
Kotomi Shiota
Effects of Low-to-medium Intensity Intradialytic Resistance Training in Elderly Chronic Hemodialysis Patients – Preliminary Effects After One Year of Intervention
Chi-Ping Tseng
The effect of Physical Therapy Intervention on Functional Mobility of Patients in the Respiratory Care Center in a Regional Hospital
Download
Huei-Sheng Shiue
The effect of Passive Robot Walking Helper with An Intention-Based Guidance System on Stroke Patients
Shivani Rajasegaran
CORRELATION BETWEEN SLEEP DISTURBANCE IN MALAYSIAN CHILDREN WITH CEREBRAL PALSY AND THEIR PRIMARY CAREGIVERS
Download
Sun Hye Shin
Estimation of Muscular Activity in Lower limbs according to Cycle-pedaling Direction with Spine Position
Download
Shuji Matsumoto
Intra-rater and inter-rater reliability of the portable gait rhythmogram in post-stroke patients
Shuji Matsumoto
A comparative study of duloxetine and paroxetine in Japanese patients with post-stroke depression
Shyh Poh Teo
Geriatric Inpatients in RIPAS Hospital, Brunei: Patient characteristics and rehabilitation needs
Download
Katsunoub Sugihara
Recovery from tube feeding with intensive rehabilitation in convalescent rehabilitation ward
Download
Shinji Kimura
Cognitive behavioral therapy-based exercise facilitation method using the “Ikiiki Rehabilitation Notebook†in patients with chronic pain
Download
Slavica M. Golubovic
Articulation of sounds, oral praxia, byte, lateralization and graphomotorics in children of preschool age
Seongmi Song
Evaluation of Lower Limb Pattern during StairEvaluation of Lower Limb Pattern during Stair Descend According to Body Weight Support Percentages with Active Harness System
Sokichi Maniwa
Effects of Nordic walking exercise in patients with hip osteoarthritis
Shirley S.M. Fong
Direction-specific impairment of stability limits and falls in children with developmental coordination disorder
Shirley S.M. Fong
Validity of a single-channel electroencephalographic device in children with developmental coordination disorder
Shin Min-a
The factors influencing community reintegration in patients with acquired disabilities in South Korea
Chowdhury Md. Kamrul Hasan
Experience of Work Performance in Readymade Garment (RMG) Factories of Bangladesh of the Person With Spinal Cord Injury (PSCI) After Completing Rehabilitation and Vocational Training
Download
Styliani Papakosta
Quality of Life, anxiety and depression scale in patients after stroke
Styliani Papakosta
Body Mass Index (BMI) influence on outcome of patients with Knee arthroplasty and Hip arhtoplasty/ intertrochanteric femoral fracture
Styliani Papakosta
Professional Quality of Life among health care workers in a Rehabilitation Center in Greece
Ji Woong Park
Diabetic Influences on the Biomechanical Properties of Human Skin
Download
Sreejith Kalathummarath
Correlation of clinical features, soft tissue Ultrasonography and electrophysiological studies in carpal tunnel syndrome
Download
Seiko Shibata
Organized inpatient care in a stroke care unit are improving patient's FIM efficiency
Download
Ryoko Akahori
Use of Swallow Chair for evaluation and direct training in a patient with dysphagia caused by multiple cranial nerve neuropathies
Stijn De Baets
The influence of the Ehlers Danlos Syndrome on motherhood: a phenomenological, hermeneutical study
Download
Aki Sumiya
Aerobic responses of slow speed nordic walking for healthy people
Download
Min Su
EFFECTS OF REPETITIVE TRANSCRANIAL MAGNETIC STIMULATION(RTMS)ON THE BALANCE FUNCTION OF PATIENTS WITH POSTERIOR CIRCULATION STROKE
Download
Min Su
STUDY OF BY MUSCLE-SKELETON ULTRASOUND TO EVALUATE THE PERIPHERAL MAGNETIC STIMULATION ON SHOULDER DISLOCATION AFTER STROKE
Download
Sunil Ankolekar
PROSTHETIC REHABILITATION FOLLOWING DEEP VEIN THROMBOSIS
Download
Chung-Ya Kang
CORRELATION BETWEEN QUALITY OF LIFE AND UPPER EXTRIMITY FUNCTION IN STROKE PATIENTS
Download
Susana Pinto
QUALITY OF LIFE PERCEPTION OF PATIENTS WITH AMYOTROPHIC LATERAL SCLEROSIS
Download
Sudirman Sinaga
RELATIONSHIP BETWEEN FUNCTIONAL EXERCISE CAPACITY AND BALANCE IN CHRONIC OBSTRUCTIVE PULMONARY DISEASE
Download
Suzuki Toshiaki
A Mismatch of F-Wave Data and Clinical Findings in a Patient with Cerebrovascular Disease
Download
Megumi Suzuki
INITIAL VALIDATION OF THE JAPANESE VERSION OF THE QOLIBRI (QUALITY OF LIFE AFTER BRAIN INJURY)
Shuya Chen
Innovative health devices in improving physical activity of older adults attending the community caring centers in Taiwan: a pilot study
Download
Istvan Szel
SCREENING TO OBSTRUCTIVE SLEEP APNEA (OSA) OF STROKE PATIENTS WITH RESPIRATORY PULSE-OXIMETER AT THE LOCATION OF THEIR POST-ACUTE INPATIENT REHABILITATION PROGRAM
Download
Takefumi Sugiyama
Effects of posture on chest wall kinematics in patients with cervical spinal cord injury
Download
Yasutaka Takagi
INTRATHECAL BACLOFEN (ITB) THERAPY TO SEVERE SPASTICITY
Takaji Suzuki
Is it practical to use Canadian Occupational Performance Measure in OSCE?
Download
Takahiro Miura
Effects of chronic exercise on renal dysfunction in the rats with polycystic kidney
Yuichi Takeuchi
Efficacy of cryotherapy following total hip arthroplasty
Download
Yuichi Takeuchi
The transition and efficacy of patient-perceived leg length discrepancy following total hip arthroplasty
Download
Mei Tang
Two Different Electrophysiological Testing Methods for Radial Tunnel Syndrome Diagnosis
Download
Hiroki Tanikawa
Contralateral Lower Limb Stabilization Influences Hip Abductor Muscle Strength Measured by Hand-Held Dynamometer
Download
Tan Yi Yan
Effect of Cardiac Rehabilitation on Exercise Capacity Following Myocardial Infarction
Download
Tarit Datta
The rehabilitation of the child with congenital limb deficiency in rural India
Download
Yuto Tashiro
Effect of Capacitive and Resistive electric transfer system on local blood circulation and skin superficial / deep temperature
Download
Taslim Uddin
COMMUNITY AND RELIGIOUS LEADERS AS THE EARLY RES-PONDER OF NATURAL DISASTERS
Chee Jiun Tan
Efficacy of therapeutic application of low-frequency repetitive transcranial magnetic stimulation (rtms) for post-stroke upper limb spasticity
Download
Tengku Misdalia
The Loaded Sit to Stand exercise with Periodization Gross Motor Function Measure Dimension D Palsy Cerebral Spastic Diplegia
Download
Tung-Chieh Hsieh
A New Test for Measuring the Extensibility of Median Nerve and Related Myofasciae in Subjects with Increased Mechanosensitivity: A Reliability Study
Kazuko Takahashi
Orthopedic selective spasticity-control surgery performed after convalescent rehabilitation in a patient with subarachnoid hemorrhage: A case report
Miho Inoue
Transcutaneous Carbon Dioxide (CO2) Application Inhibits Muscle Atrophy after Femoral Shaft Fracture in Rat
Download
Yong Seok Lee
Assessment of the oral health care of stroke patients by caregivers
Koji Totoribe
Evaluation of Contact Pressure on Total Surface Bearing and Patellar Tendon Bearing Sockets during Gait
Download
Takako Saotome
Compliance of lower leg orthosis in Myotonic Dystrophy patients
Tarek Shafshak
CAUSES OF GENERALIZED MUSCULOSKELETAL PAIN AMONG PATIENTS ATTENDING PHYSICAL MEDICINE AND RHEUMATOLOGY CLINICS
Akio Tsubahara
Usefulness of Ultrasonography of the Suprahyoid Muscles during Swallowing
Download
Atsuhiro Tsubaki
CORTICAL OXYGENATION DURING HIGH-INTENSITY CYCLING EXERCISE: A NEAR-INFRARED SPECTROSCOPY STUDY
Download
Tsukasa Tamaru
The outcome of convalescent rehabilitation in patients at 90-year and older, a 5-year retrospective study
Download
Mehmet Tuncay Duruöz
The Turkish Validity and Reliability of the Jenkins Sleep Scale in Ankylosing Spondylitis
Download
Mehmet Tuncay Duruöz
Reliability and Validity of Seattle Angina Questionnaire in a Turkish Population (SAQ-TR)
Download
Tze Chao Wee
VITAMIN D DEFICIENCY IN PATIENTS UNDERGOING INPATIENT REHABILITATION
Download
Takatoshi Hara
Effects of botulinum toxin A injections and multidisciplinary rehabilitation on upper and lower limb spasticity in post-stroke patients
Nobuyuki Arai
Developing a method of measuring the velocity of the bolus and upper esopahgeal sphincter opening duration using ultrasonography
Download
Tomoyuki Ueno
Gait Retraining Strategies Using the New Exoskeleton Robot HAL for Acute Sroke Patients
Download
Tomoyuki Ueno
Gait changes in patients with hemiplegia after stroke during walking with a non-actuated locomotor assistive device ACSIVE
Download
Ümüt Güzelküçük
A rare cause of hip pain: Transient osteoporosis
Ümüt Güzelküçük
Lower Limb Amputation after Coronary Bypass Surgery
Ümüt Güzelküçük
Non-healing surgical wound on the stump
Ümüt Güzelküçük
Spinal cord injury resulting from gunshot wounds: a comparative study with non-gunshot causes
CHIEH YU LIU
Therapeutic Ultrasound Attenuates Post-incisional Pain in Rats
Download
Umut Safer
Effects of Bisphosphonates and Calcium plus Vitamin-D Supplements on Cognitive Function in Postmenopausal Osteoporosis
Download
Ruby Valentine
Identifying the leading problems among stroke survivors in UMMC using Post Stroke Checklist
Download
Kappaganthu Prasanna
A CASE REPORT ON USE OF NERVE BLOCK FOR PARKINSON'S ASSOCIATED RIGIDITY
Jung-Cheng Yang
Home-based Physical Therapy for disable elderly people at a regional hospital in Taiwan
Download
wafa Said lahmar
Treatment of clubfoot by Ponseti technique coupled with rehabilitation
wafa Said lahmar
Neuromyelitis Optica : A Case Report with a review of literaure
wafa Said lahmar
Orthopedic and functional evolution of osteogenesis imperfecta about two cases
wafa Said lahmar
Peripheral nerve compression in patient with sequels of poliomyelitis
wafa Said lahmar
Management of cerebral palsy child whith protein-s deficiency
wafa Said lahmar
Rehabilitation treatment of spinal muscular atrophy type II
Tatsushi Wakasugi
Reduction in muscle oxygen metabolism during HSCT engraftment in the clean room
Download
Quan Wei
Effectiveness of lumbar traction versus McKenzie method in patients with lumbar disc herniation : a randomized controlled trial
Hai tao Wei
Independence of kinesthe$c short-term memory for movement from verbal short-term memory
Mitsuhiro Ochi
The sustained effect of peroneal nerve functional electrical stimulation in patients with chronic stroke: a pilot multicenter clinical trial.
Wai Sang WU
AN ACTION RESEARCH ON ASSISTING A FAMILY CAREGIVER OF A PERSON WITH SPINAL CORD INJURY IN HONG KONG - A PILOT STUDY
Wong Yean Tzeh
SATISFACTION OF CAREGIVERS AND COMPLIANCE OF AFO USE IN CEREBRAL PALSY CHILDREN
Wouter De Groote
Identification of rehabilitation needs for children with spina bifida and hydrocephalus in East Africa
Download
Wan Yusoff Wan Rozita
LEFT UNILATERAL NEGLECT OR ALIEN HAND SYNDROME? : A CASE REPORT
Download
Wei-ting Wu
Application of The Kinesio Taping Method on swallowing difficultly of newborn: a Case Report and Literature Review
Download
Xiaoxia Zhu
Physiological and Biomechanical Effects of Far-infrared Spectrum Irradiation Combined with Ergonomics intervention on Neck Muscles
Masayuki Yamada
SCORING TENDENCY OF JAPANESE TRAUMATIC BRAIN INJURY INDIVIDUALS IN THE FRENCHAY ACTIVITIES INDEX (FAI)
Download
Yasuyuki Matsushima
Oxidative DNA damage increased in polio survivors
Yong Kyun Kim
Applying a balloon catheter to a study on asymmetric bolus passage through the pharyngoesophagus
Pei-Yu Yang
Scoliosis in Non-ambulatory Cerebral Palsy
Yanna Susanti
COMPARATION OF PELVIC FLOOR MUSCLE ENDURANCE IN PRIMIPAROUS AFTER BIOFEEDBACK METHOD OF PELVIC FLOOR MUSCLE EXERCISE BEGINNING 3 AND 6 WEEKS POST NORMAL VAGINAL DELIVERY
Download
Norhayati Hussein
Acquisition of Knowledge in Hemiplegic Care via Experiential Learning Model
Download
Norhayati Hussein
Middle Cerebral Artery Territory Infarct in a Young Individual with Marfan Syndrome
Norhayati Hussein
Rehabilitation of Miller Fisher Syndrome: More Than Meets The Eyes
Duk Hyun Sung
Polymyalgia rheumatica in Korean population : Demographic and clinical characteristics, an experience in a nonspecialized locomotor pain clinic
Download
Yasin Demir
Bone mass and vitamin D levels in Turkish patients with Parkinson's disease: a case control study
Yasin Demir
Chronic Pain in Parkinson's Disease: Frequency, Characteristics, Independent Factors, and Relationship with Health-Related Quality of Life
Yasin Demir
Comparison of early mobilization and immobilization techniques in patients with palmar fasciectomy for Dupuytren contracture
Yasin Demir
Drug-Induced Dysphagia in Stroke Patient: A Case Report
Yasin Demir
Dysfunction of hypothalamic-hypophysial axis interfering with traumatic brain injury rehabilitation
Yasin Demir
Functions of the Inner Ear in Psoriatic Arthritis
Yasin Demir
Hearing abnormalities in patients with osteoarthritis
Yasin Demir
Hoffa's Disease in a Patient with Unilateral Below Knee Amputation
Yasin Demir
Implementation of a respiratory rehabilitation, ventilator weaning and tracheostomy decannulation protocol for tetraplegic patients: Initial experience in a rehabilitation clinic
Yasin Demir
Inter-rater agreement of the Turkish version of the neurobehavioral rating scale revised form among patients with traumatic/hypoxic brain injury
Yasin Demir
Lower bone mineral density and vitamin D status in patients with Parkinson's disease: When?
Yasin Demir
Musculoskeletal pain in Parkinson's Disease: its prevalence and relationship to daily living activities, depression and quality of life
Yasin Demir
Suprascapular Nerve Injury Disguised by Supraspinatus Tendon Rupture
Yasin Demir
The Effect of Sensory-Level Electrical Stimulation of the Masseter Muscle in Early Stroke Patients with Dysphagia: A Randomized Controlled Study
Yasin Demir
The Efficacy of Ultrasound in the Diagnosis of Tendon Adhesion
Yasin Demir
Treatment resistance in hypoxic brain injury caused by cardiopulmonary arrest due to an allergic anaphylaxis: Spasticity, myoclonus or both?
Yasin Demir
Validity and Reliability of the Turkish Version of the 39-item Parkinson's Disease Questionnaire (PDQ-39)
Yee Mon Myint
PROSTHESIS SERVICES FOR DIFFERENT TYPES OF AMPUTEES IN NATIONAL REHABILITATION HOSPITAL, MYANMAR
Download
Omoyemi Ogwumike
PERCEIVED HEALTH STATUS, SELF-REPORTED AND PERFORMANCE-BASED PHYSICAL FUNCTION IN A SAMPLE OF ADULTS WITH OSTEOARTHRITIS OF THE KNEE
Download
YESOON KIM
A multi-component intervention to improve diet and physical activity people with intellectual disabilities in community residences
Download
Eun-Hi Choi
Effect of non-pharmacological intervention on obese people in terms of body composition and cytokines
Yi-Han Liao
The Relation Between Recovery and Motion Features in Virtual Reality for Stroke Rehabilitation
Ya-Ju Chang
TEST-RETEST RELIABILITY OF SINGLE AND DUAL-WALKING TESTS
Download
Yong-Taek LEE
Correlation of Joint Volume and Passive ROM with Quantitative Measurement of Contrast-Enhanced MRI in Adhesive Capsulitis of Shoulder
Download
Yong-Taek LEE
Comparative Clinical Outcome Study of Low-Energy Extracorporeal Shock Wave Therapy (ESWT) for Chronic Achilles Tendinopathy According to Imaging Study Findings
Download
Yoona Cho
Modified Tardieu scale to estimate length of semimembranosus and sagittal knee angle during gait cycle in spastic cerebral palsy
Download
Yorck B. Kalke
The in 2014 actualized osteoporosis guidelines of the joint organizations of the German-speaking bone research societies and their meaning for paralyzed elderly patients
Download
Yorck B. Kalke
Traumatic and Nontraumatic Spinal Cord Injury in Germany
Download
Yoshi-ichiro Kamijo
Thermoregulatory responses in persons with spinal cord injury
Yoshitada Sakai
Management of the patients with bone metastasis under bone metastasis cancer board
Ching-Hsiang Yang
The Effects of Acupoint Stimulation Using Therapeutic Ultrasound on Improve of Life Quality and Sensory Impairments for Cancer Patients with Oxaliplatin-induced Peripheral Neuropathy
Raju Dhakal
Rapid implementation of medical rehabilitation team at Spinal Injury Rehabilitation Center, Nepal during earthquake 2015
Download
Naoki Yoshida
Comparison of the solid angle size of the shoulder complex sinus with and without the effect of compensatory trunk motion in healthy males
Download
Yusuke Shinoda
Multidisciplinary team approach to the patients with pelvic metastases: Analyses of 46 patients
Download
Yuen Woei Neoh
MANAGING CHRONIC PRESSURE ULCER IN CONGENITAL LIMB DEFICIENCY USING TOTAL CONTACT CASTING
Download
Yukihide Nishimura
Plasma interleukin-6 changes at wheelchair basketball games of spinal cord injury persons
Lehua Yu
Does Enhanced External Counterpulsation (EECP) Significantly Affect Myocardial Perfusion?: a Systematic Review and Meta-Analysis
Download
Shinya Yura
Effectiveness of enforced mouth opening exercise in patients with contracture of the masseter muscle
Yuki Uchiyama
H-reflex and T-reflex changes in botulinum toxin type A treatment for lower-limb spasticity in post-stroke patients
Download
Daisuke Nishio
Overnight trip to Kinugawa hot spring for the stroke patients who were discharged from our convalescent rehabilitation hospital
Download
Zafefe Abd Rahman
One year outcome after traumatic brain injury: Preliminary report
Download
Zbigniew Sliwinski
Analysis of body posture of children with idiopathic scoliosis in the image diers after the application of kinesiology taping application
Download
Zbigniew Sliwinski
Radiological progress report of curing scoliosis according to the fed method based on own material
Download
Zbigniew Sliwinski
The evaluation of chosen body posture parameters in children with scoliosis - own materials
Download
Zhang Pande
A Survey of Rehabilitation Medicine Services in Foshan of China
Download
Jun Zhou
EFFECTS OF PULSED ELECTROMAGNETIC FIELDS ON OVARIECTOMY-INDUCED OSTEOPOROSIS AND RANK EXPRESSION IN RATS
Download
Yuan Zhou
Improvement of balance control with taping in people with non-specific chronic low back pain
Kang Jinkyu
Interleukin-6 Receptor Polymorphisms Contribute to the Neurological Status of Korean Patients with Ischemic Stroke
Zhang Ming
THERAPEUTIC EFFECT OF MULLIGAN TECHNIQUE WITH THE NECK MUSCLE TRAINING FOR TREATMENT OF THE NERVE ROOT TYPE OF CERVICAL SPONDYLOSIS
Download
Zorislava Bajic
Functional consequences and rehabilitation after surgical treatment of tumor like lesion - case report
Download
Mohd Rozali Zetty Noreeta
Reduced plantar-flexion contracture post botulinum toxin A injection in traumatic brain injury patient. A case report
Download